Triple
T8414122
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Artesyn Embedded Technologies |
E198691
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power electronics company |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power electronics company Context triple: [Artesyn Embedded Technologies, instanceOf, power electronics company]
-
A.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
-
B.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
C.
energy solutions company
An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
-
D.
electronic design automation company
An electronic design automation company develops and provides software tools and services that enable engineers to design, simulate, verify, and optimize electronic systems and integrated circuits.
-
E.
industrial automation company
An industrial automation company designs, develops, and implements control systems, robotics, and software solutions to optimize and automate manufacturing and industrial processes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca831201b481909e137936ef99ff11 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:06 p.m.