Triple

T8399489
Position Surface form Disambiguated ID Type / Status
Subject Jesuit Ratio Studiorum E198135 entity
Predicate instanceOf P0 FINISHED
Object educational plan C5447 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: educational plan
Context triple: [Jesuit Ratio Studiorum, instanceOf, educational plan]
  • A. planning school
    A planning school is an educational institution or academic program focused on teaching the theories, methods, and practices of urban and regional planning to prepare professionals for shaping the built and natural environment.
  • B. educational journey
    An educational journey is the evolving, lifelong process through which an individual acquires knowledge, skills, and personal growth across diverse learning experiences and environments.
  • C. educational program chosen
    An educational program is an organized set of learning experiences, courses, and activities designed to achieve specific educational goals and outcomes for a defined group of learners.
  • D. educational project
    An educational project is a structured learning initiative designed to achieve specific educational objectives through planned activities, resources, and assessments.
  • E. educational stage
    An educational stage is a distinct, structured phase within a formal learning system characterized by specific developmental goals, curricula, and typical age ranges for learners.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f816bc8190ab321c07d72208c1 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 6:04 p.m.