Triple

T8392238
Position Surface form Disambiguated ID Type / Status
Subject Sennar Dam E197968 entity
Predicate relatedProject P2830 FINISHED
Object Gezira Scheme E235413 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gezira Scheme | Statement: [Sennar Dam, relatedProject, Gezira Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gezira Scheme
Context triple: [Sennar Dam, relatedProject, Gezira Scheme]
  • A. Gezira Scheme chosen
    The Gezira Scheme is one of the world’s largest irrigation projects, located between the Blue and White Nile in Sudan and primarily devoted to cotton and other agricultural production.
  • B. Shannon hydroelectric scheme
    The Shannon hydroelectric scheme is a major early 20th-century Irish engineering project that harnesses the River Shannon to generate electricity and played a key role in the country’s industrial development.
  • C. Jobra Barrage
    Jobra Barrage is a major irrigation and flood-control structure on the Mahanadi River near Cuttack in Odisha, India.
  • D. Kosi Barrage
    Kosi Barrage is a major flood-control and irrigation structure built across the Kosi River near the India–Nepal border.
  • E. Grand Inga Dam Project
    The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f749388190bffbea6dfb509016 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb810e16b081908e2c25bfb9d590ed completed March 31, 2026, 8:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69ce1d1ffa988190a7b0a6b1017e144d completed April 2, 2026, 7:39 a.m.
Created at: March 30, 2026, 6:03 p.m.