Triple

T8388417
Position Surface form Disambiguated ID Type / Status
Subject WTA 250 tournaments E197877 entity
Predicate includeQualifyingDraw P12110 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [WTA 250 tournaments, includeQualifyingDraw, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: includeQualifyingDraw
Context triple: [WTA 250 tournaments, includeQualifyingDraw, yes]
  • A. hasQualifyingRounds chosen
    Indicates that an event or competition includes preliminary qualifying rounds that participants must complete before advancing further.
  • B. playsQualificationMatches
    Indicates that an entity participates in qualification matches, typically as part of a preliminary stage to qualify for a main event or competition.
  • C. usesQualificationSystem
    Indicates that an entity applies or relies on a specific qualification system as part of its processes or operations.
  • D. hasKnockoutStageDraw
    Indicates that an event or competition includes a defined draw or bracket structure for its knockout stage matches.
  • E. runnerUpQualification
    Indicates that an entity attains a qualifying position or status specifically by being a runner-up in a competition or selection process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f749388190bffbea6dfb509016 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb81090f688190a3a8d1680383c361 completed March 31, 2026, 8:08 a.m.
PD Predicate disambiguation batch_69cb70cfe82881909fe374ba52649e84 completed March 31, 2026, 6:59 a.m.
Created at: March 30, 2026, 6:03 p.m.