Triple

T8372493
Position Surface form Disambiguated ID Type / Status
Subject Statler Hotel Dallas E197491 entity
Predicate instanceOf P0 FINISHED
Object mid-century modern building C6817 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mid-century modern building
Context triple: [Statler Hotel Dallas, instanceOf, mid-century modern building]
  • A. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • B. modernisme building
    A modernisme building is an early 20th-century architectural structure characterized by organic forms, rich ornamentation, innovative use of materials, and a synthesis of arts and crafts, particularly associated with Catalan Modernism.
  • C. Mediterranean Revival building
    A Mediterranean Revival building is an architectural structure characterized by stucco walls, red tile roofs, arches, and ornamental details inspired by Spanish, Italian, and other Mediterranean coastal traditions.
  • D. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • E. modernist architectural work chosen
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f56730819080cec5d991c76f4c completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 6:01 p.m.