Triple

T8370561
Position Surface form Disambiguated ID Type / Status
Subject 2015 Algiers Agreement for Peace and Reconciliation in Mali E197440 entity
Predicate implementationChallenge P31731 FINISHED
Object slow implementation of key provisions LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: slow implementation of key provisions | Statement: [2015 Algiers Agreement for Peace and Reconciliation in Mali, implementationChallenge, slow implementation of key provisions]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: implementationChallenge
Context triple: [2015 Algiers Agreement for Peace and Reconciliation in Mali, implementationChallenge, slow implementation of key provisions]
  • A. developmentChallenges
    Indicates difficulties, obstacles, or constraints that hinder or complicate the process of developing or improving something.
  • B. operationalChallenge
    Indicates that an entity faces difficulties, obstacles, or inefficiencies in carrying out its regular operations or processes.
  • C. designChallenge
    Indicates a situation in which an entity is tasked with creating, improving, or solving something through a structured design problem or assignment.
  • D. challengeType chosen
    Indicates the specific category or kind of challenge associated with an action or relationship between entities.
  • E. implementationStatus
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f56730819080cec5d991c76f4c completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb80a400888190bef114052f3c4f76 completed March 31, 2026, 8:07 a.m.
PD Predicate disambiguation batch_69cb70cd04b08190ab5f72afd22a7967 completed March 31, 2026, 6:59 a.m.
Created at: March 30, 2026, 6:01 p.m.