Triple

T8370503
Position Surface form Disambiguated ID Type / Status
Subject 1992 National Pact (Mali) E197439 entity
Predicate implementationChallenges P71878 FINISHED
Object delays in decentralization measures LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: delays in decentralization measures | Statement: [1992 National Pact (Mali), implementationChallenges, delays in decentralization measures]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: implementationChallenges
Context triple: [1992 National Pact (Mali), implementationChallenges, delays in decentralization measures]
  • A. developmentChallenges
    Indicates difficulties, obstacles, or constraints that hinder or complicate the process of developing or improving something.
  • B. constructionChallenges
    Indicates difficulties, obstacles, or complications encountered during the process of constructing or building something.
  • C. operationalChallenge
    Indicates that an entity faces difficulties, obstacles, or inefficiencies in carrying out its regular operations or processes.
  • D. currentChallenges chosen
    Indicates the difficulties or obstacles an entity is presently facing or dealing with.
  • E. implementationStatus
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f56730819080cec5d991c76f4c completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb80a400888190bef114052f3c4f76 completed March 31, 2026, 8:07 a.m.
PD Predicate disambiguation batch_69cb70cd04b08190ab5f72afd22a7967 completed March 31, 2026, 6:59 a.m.
Created at: March 30, 2026, 6:01 p.m.