Triple

T8364669
Position Surface form Disambiguated ID Type / Status
Subject Port of Faro E197095 entity
Predicate instanceOf P0 FINISHED
Object maritime harbor C453 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maritime harbor
Context triple: [Port of Faro, instanceOf, maritime harbor]
  • A. coastal harbour
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • B. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • C. maritime warehouse
    A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
  • D. maritime structure
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • E. harbor chosen
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f2dbe48190aba982e75a0d94de completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 6 p.m.