Triple

T8341019
Position Surface form Disambiguated ID Type / Status
Subject MV-22B Osprey E195912 entity
Predicate instanceOf P0 FINISHED
Object VTOL aircraft C2491 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: VTOL aircraft
Context triple: [MV-22B Osprey, instanceOf, VTOL aircraft]
  • A. short takeoff and vertical landing aircraft chosen
    A short takeoff and vertical landing aircraft is a type of airplane designed to operate from very short runways and perform vertical or near-vertical takeoffs and landings using specialized lift and thrust systems.
  • B. tandem-wing aircraft
    A tandem-wing aircraft is an airplane configuration featuring two main lifting wings arranged one behind the other along the fuselage, both contributing significantly to lift and stability.
  • C. jet-powered hydroplane
    A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
  • D. pilotless aircraft
    A pilotless aircraft is an unmanned aerial vehicle that operates without an onboard human pilot, controlled either remotely or autonomously via onboard systems.
  • E. turboprop aircraft
    A turboprop aircraft is a fixed-wing airplane powered by one or more gas-turbine engines that drive propellers to provide efficient thrust at low to medium flight speeds.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ecbdc481908a55cad8ca062d88 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:58 p.m.