Triple

T8334154
Position Surface form Disambiguated ID Type / Status
Subject Vistra Corp E195145 entity
Predicate instanceOf P0 FINISHED
Object power generation company C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power generation company
Context triple: [Vistra Corp, instanceOf, power generation company]
  • A. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • B. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • C. multinational utility company
    A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
  • D. integrated energy company
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • E. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e87f2c8190bdb71ee29dfc642d completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:57 p.m.