Triple

T832356
Position Surface form Disambiguated ID Type / Status
Subject Expo 2020 E17992 entity
Predicate originalPlannedOpeningDate P4691 FINISHED
Object 2020-10-20 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020-10-20 | Statement: [Expo 2020, originalPlannedOpeningDate, 2020-10-20]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: originalPlannedOpeningDate
Context triple: [Expo 2020, originalPlannedOpeningDate, 2020-10-20]
  • A. officialOpeningDate
    Indicates the calendar date on which something is formally inaugurated or officially opened for use or operation.
  • B. datePlanned chosen
    Indicates that a specific date has been scheduled or intended for a particular event, action, or relationship to occur.
  • C. reopeningDate
    Indicates the date on which something that was previously closed is opened again for use or access.
  • D. expansionOpeningDate
    Indicates the date on which an expansion of something (such as a facility, service, or project) was officially opened or became operational.
  • E. originalPlannedLaunchYear
    Indicates the year that was initially scheduled or intended for an entity’s launch before any delays or changes.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4937c9c188190aaa216f6b466f452 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4abb647988190950e1790bcfa60a5 completed March 1, 2026, 9:12 p.m.
PD Predicate disambiguation batch_69a4aa7b3d2481909199f7c9f305bdfe completed March 1, 2026, 9:07 p.m.
Created at: March 1, 2026, 7:38 p.m.