Triple

T8303890
Position Surface form Disambiguated ID Type / Status
Subject French Ministry for the Ecological Transition (transport portfolio) E194412 entity
Predicate instanceOf P0 FINISHED
Object transport ministry portfolio C3209 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport ministry portfolio
Context triple: [French Ministry for the Ecological Transition (transport portfolio), instanceOf, transport ministry portfolio]
  • A. transport ministry chosen
    The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
  • B. transportation organization
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • C. tourism ministry
    The tourism ministry is a government body responsible for developing, promoting, and regulating a country's tourism sector to enhance economic growth and cultural exchange.
  • D. transportation executive
    A transportation executive is a senior leader responsible for planning, directing, and optimizing an organization’s transportation and logistics operations to ensure efficient, cost-effective, and compliant movement of goods or people.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e613e88190bf8139669bbd0d53 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:53 p.m.