Triple

T8299014
Position Surface form Disambiguated ID Type / Status
Subject Narvik–Germany iron ore route E194297 entity
Predicate instanceOf P0 FINISHED
Object World War II supply line C23863 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II supply line
Context triple: [Narvik–Germany iron ore route, instanceOf, World War II supply line]
  • A. World War II campaign
    A World War II campaign is a coordinated series of military operations conducted over a specific period and geographic area, aimed at achieving strategic objectives within the broader context of the war.
  • B. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • C. batalla de la Segunda Guerra Mundial
    Una batalla de la Segunda Guerra Mundial es un enfrentamiento militar específico, terrestre, naval o aéreo, ocurrido entre 1939 y 1945, que involucró fuerzas de las potencias aliadas y/o del Eje con objetivos estratégicos definidos dentro del conflicto global.
  • D. World War II front
    A World War II front is a large-scale, geographically defined theater of military operations where opposing forces engaged in sustained combat and strategic maneuvers during the Second World War.
  • E. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e50ebc81909aa7b260c76bd757 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:53 p.m.