Triple

T8285976
Position Surface form Disambiguated ID Type / Status
Subject OSR2.5 E193787 entity
Predicate instanceOf P0 FINISHED
Object OEM Service Release C8814 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: OEM Service Release
Context triple: [OSR2.5, instanceOf, OEM Service Release]
  • A. operating system enhancement pack
    An operating system enhancement pack is a collection of add-on tools, features, and optimizations designed to extend and improve the functionality, performance, and usability of an existing operating system.
  • B. operating system version chosen
    An operating system version is a specific release of an operating system, identified by a unique number or name, that encapsulates a defined set of features, updates, and compatibility characteristics.
  • C. software product edition
    A software product edition is a specific version or configuration of a software product that bundles particular features, capabilities, and licensing terms targeted at a defined user segment or use case.
  • D. OSS branch
    An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
  • E. discontinued operating system
    A discontinued operating system is a software platform for managing computer hardware and applications that is no longer developed, supported, or officially distributed by its creator.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e32db481908b72f3804fa71152 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:52 p.m.