Triple

T8274592
Position Surface form Disambiguated ID Type / Status
Subject Interstate Highways in Washington (state) E193510 entity
Predicate hasComponent P35 FINISHED
Object Interstate 605 (proposed) in Washington
Interstate 605 (proposed) in Washington is a never-built auxiliary Interstate concept that was intended to serve as an additional bypass or connector route within the state’s freeway network.
E723018 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 605 (proposed) in Washington | Statement: [Interstate Highways in Washington (state), hasComponent, Interstate 605 (proposed) in Washington]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 605 (proposed) in Washington
Context triple: [Interstate Highways in Washington (state), hasComponent, Interstate 605 (proposed) in Washington]
  • A. Interstate 565
    Interstate 565 is a short auxiliary Interstate Highway in northern Alabama that connects Huntsville to Interstate 65 and serves as a major regional transportation corridor.
  • B. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • C. Interstate Highways in Washington (state)
    Interstate Highways in Washington (state) are a network of federally funded, high-speed roadways that connect major cities and regions within Washington to the broader U.S. Interstate Highway System.
  • D. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • E. Interstate 526
    Interstate 526 is a partial beltway and auxiliary Interstate Highway serving the Charleston metropolitan area in South Carolina, connecting key suburbs, industrial zones, and major routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 605 (proposed) in Washington
Triple: [Interstate Highways in Washington (state), hasComponent, Interstate 605 (proposed) in Washington]
Generated description
Interstate 605 (proposed) in Washington is a never-built auxiliary Interstate concept that was intended to serve as an additional bypass or connector route within the state’s freeway network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 605 (proposed) in Washington
Target entity description: Interstate 605 (proposed) in Washington is a never-built auxiliary Interstate concept that was intended to serve as an additional bypass or connector route within the state’s freeway network.
  • A. Interstate 565
    Interstate 565 is a short auxiliary Interstate Highway in northern Alabama that connects Huntsville to Interstate 65 and serves as a major regional transportation corridor.
  • B. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • C. Interstate Highways in Washington (state)
    Interstate Highways in Washington (state) are a network of federally funded, high-speed roadways that connect major cities and regions within Washington to the broader U.S. Interstate Highway System.
  • D. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • E. Interstate 526
    Interstate 526 is a partial beltway and auxiliary Interstate Highway serving the Charleston metropolitan area in South Carolina, connecting key suburbs, industrial zones, and major routes.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e14ae481908ffdb822cd2192bc completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb798bc29c8190927ef4b0662d6b98 completed March 31, 2026, 7:36 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd68502888819084bfe4621978711d completed April 1, 2026, 6:47 p.m.
NEDg Description generation batch_69cd6c21172481908dc04b85ee4370a8 completed April 1, 2026, 7:04 p.m.
NED2 Entity disambiguation (via description) batch_69cd7e0d1b8c8190b5183cc176432061 completed April 1, 2026, 8:20 p.m.
Created at: March 30, 2026, 5:51 p.m.