Triple

T8274477
Position Surface form Disambiguated ID Type / Status
Subject I-205 E193507 entity
Predicate connectsTo P845 FINISHED
Object US 26 E465168 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 26 | Statement: [I-205, connectsTo, US 26]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US 26
Context triple: [I-205, connectsTo, US 26]
  • A. US 66
    US 66 is a historic U.S. highway, famously known as "Route 66," that once ran from Chicago to Los Angeles and became an iconic symbol of American road travel and culture.
  • B. US 23
    US 23 is a major north–south United States highway running from Florida to Michigan, serving as an important regional transportation corridor.
  • C. US 27
    US 27 is a major north–south United States highway running from southern Florida through several states to the Midwest.
  • D. SR 266
    SR 266 is a state highway in Georgia that serves as a regional connector route within the state's road network.
  • E. Sunset Highway (U.S. Route 26) chosen
    Sunset Highway (U.S. Route 26) is a major freeway in the Portland, Oregon metropolitan area that serves as a primary east–west route connecting downtown Portland with its western suburbs and the Oregon coast.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e14ae481908ffdb822cd2192bc completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb798bc29c8190927ef4b0662d6b98 completed March 31, 2026, 7:36 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd68502888819084bfe4621978711d completed April 1, 2026, 6:47 p.m.
Created at: March 30, 2026, 5:51 p.m.