Triple

T8274467
Position Surface form Disambiguated ID Type / Status
Subject I-205 E193507 entity
Predicate divertsTrafficFrom P32500 FINISHED
Object I-5 E18390 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-5 | Statement: [I-205, divertsTrafficFrom, I-5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-5
Context triple: [I-205, divertsTrafficFrom, I-5]
  • A. Interstate 5 chosen
    Interstate 5 is a major north–south U.S. highway running along the West Coast from the Mexican border in California through Oregon and Washington to the Canadian border.
  • B. Highway 99
    Highway 99 is a major scenic highway in British Columbia, Canada, that connects Vancouver to the resort town of Whistler and continues north through the Coast Mountains.
  • C. Highway 99
    Highway 99 is a major road in northern Israel that serves as a key route connecting Kiryat Shmona with nearby communities and regional attractions.
  • D. Interstate 526
    Interstate 526 is a partial beltway and auxiliary Interstate Highway serving the Charleston metropolitan area in South Carolina, connecting key suburbs, industrial zones, and major routes.
  • E. Oregon Route 99
    Oregon Route 99 is a north–south state highway in Oregon that largely parallels Interstate 5 and serves as a major regional route through numerous cities and towns in the western part of the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: divertsTrafficFrom
Context triple: [I-205, divertsTrafficFrom, I-5]
  • A. relievesTrafficFrom chosen
    Indicates that one entity reduces or alleviates traffic congestion that would otherwise occur on another entity.
  • B. divertedBy
    Indicates that the normal course, flow, or direction of something is changed or rerouted due to the influence or action of another entity.
  • C. facilitatesTrafficFlowBetween
    Indicates that one entity enables, supports, or improves the movement of traffic between two other entities or locations.
  • D. diversionMethod
    Indicates the method or tactic used to distract, mislead, or redirect attention or resources away from a primary target or activity.
  • E. hasTrafficDirection
    Indicates that there is a specified flow or orientation of traffic associated with an entity (such as a road, lane, or route).
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e14ae481908ffdb822cd2192bc completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb798bc29c8190927ef4b0662d6b98 completed March 31, 2026, 7:36 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd68502888819084bfe4621978711d completed April 1, 2026, 6:47 p.m.
PD Predicate disambiguation batch_69cb70a4525481909399d313a6247ace completed March 31, 2026, 6:58 a.m.
Created at: March 30, 2026, 5:51 p.m.