Triple

T8265542
Position Surface form Disambiguated ID Type / Status
Subject Presidential Jetty E193292 entity
Predicate instanceOf P0 FINISHED
Object official docking point C7394 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: official docking point
Context triple: [Presidential Jetty, instanceOf, official docking point]
  • A. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • B. official institution chosen
    An official institution is a formally established organization, typically created or sanctioned by a government or authoritative body, that exercises recognized powers and responsibilities within a defined legal or social framework.
  • C. official reception
    An official reception is a formal event organized by an institution or authority to welcome, honor, or engage guests in a ceremonial or diplomatic setting.
  • D. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • E. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e081d48190986beaa51f498ab9 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:50 p.m.