Triple
T8265211
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zikr-e-Mir |
E193284
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Urdu prose work |
C20414
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Urdu prose work Context triple: [Zikr-e-Mir, instanceOf, Urdu prose work]
-
A.
Urdu book
chosen
An Urdu book is a written work composed in the Urdu language, typically using the Perso-Arabic script, that conveys knowledge, stories, or ideas to Urdu-reading audiences.
-
B.
Punjabi literature
Punjabi literature is the body of written and oral works produced in the Punjabi language, encompassing poetry, prose, folklore, and religious texts that reflect the cultural, social, and historical experiences of Punjabi-speaking communities.
-
C.
Urdu-language newspaper
An Urdu-language newspaper is a periodical publication that reports news, opinions, and other informational content primarily in the Urdu language for its readership.
-
D.
Punjabi poetic composition
A Punjabi poetic composition is a structured literary work written in the Punjabi language that uses rhythm, imagery, and cultural expression to convey emotions, ideas, or stories.
-
E.
literaryWork
A literaryWork is a created written or spoken artistic composition, such as a novel, poem, or play, that conveys ideas, stories, or emotions through language.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82e081d48190986beaa51f498ab9 |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 5:50 p.m.