Triple
T8235053
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tianhe Sports Center Station |
E192384
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Guangzhou Metro station |
C23753
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Guangzhou Metro station Context triple: [Tianhe Sports Center Station, instanceOf, Guangzhou Metro station]
-
A.
Kaohsiung MRT station
A Kaohsiung MRT station is a designated public transit facility within the Kaohsiung Mass Rapid Transit system where passengers access, board, transfer between, and alight from metro trains and related services.
-
B.
Cairo Metro station
A Cairo Metro station is a designated public transit facility within the Cairo Metro network where passengers access, board, and transfer between metro trains and related services.
-
C.
Busan Metro station
A Busan Metro station is a designated facility along the Busan subway network where trains stop to allow passengers to board, alight, and transfer between lines or other modes of transportation.
-
D.
Kolkata Metro station
A Kolkata Metro station is a designated transit facility along the Kolkata Metro network that provides platforms, ticketing, passenger amenities, and access points for boarding and alighting metro trains within the city and its suburbs.
-
E.
Tokyo subway station
A Tokyo subway station is an underground or partially above-ground transit facility in Tokyo that serves as a node for multiple subway lines, providing passenger access, ticketing, and platform areas within a dense urban rail network.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82dc8f148190a2c75a98501a7b91 |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 5:46 p.m.