Triple

T8226041
Position Surface form Disambiguated ID Type / Status
Subject European Quarter transport axis (extended) E192174 entity
Predicate instanceOf P0 FINISHED
Object urban transport axis C1347 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban transport axis
Context triple: [European Quarter transport axis (extended), instanceOf, urban transport axis]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. urban beltway
    An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. urban arterial road
    An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
  • E. road transportation corridor chosen
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82db5b90819085d1ad7c2e27bfcc completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 5:45 p.m.