Triple

T8222431
Position Surface form Disambiguated ID Type / Status
Subject Thanet Offshore Wind Farm E192095 entity
Predicate succeededByAsLargestOffshoreWindFarm P81709 FINISHED
Object Greater Gabbard Offshore Wind Farm
The Greater Gabbard Offshore Wind Farm is a large-scale offshore wind power project in the North Sea off the Suffolk coast of England that became the world’s largest offshore wind farm upon its completion.
E723960 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Greater Gabbard Offshore Wind Farm | Statement: [Thanet Offshore Wind Farm, succeededByAsLargestOffshoreWindFarm, Greater Gabbard Offshore Wind Farm]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Greater Gabbard Offshore Wind Farm
Context triple: [Thanet Offshore Wind Farm, succeededByAsLargestOffshoreWindFarm, Greater Gabbard Offshore Wind Farm]
  • A. Barrow Offshore Wind Farm
    Barrow Offshore Wind Farm is a UK offshore wind power facility located in the Irish Sea that generates renewable electricity from wind turbines installed in coastal waters.
  • B. Gunfleet Sands Offshore Wind Farm
    Gunfleet Sands Offshore Wind Farm is a large offshore wind power facility in the Thames Estuary off the coast of Essex, England, contributing renewable electricity to the UK grid.
  • C. North Hoyle Offshore Wind Farm
    North Hoyle Offshore Wind Farm is one of the United Kingdom’s early commercial offshore wind power projects, located off the coast of North Wales and contributing renewable electricity to the national grid.
  • D. Thanet Offshore Wind Farm
    Thanet Offshore Wind Farm is a large offshore wind power facility located off the coast of Kent, England, known for being one of the earliest and once the largest operational offshore wind farms in the world.
  • E. Robin Rigg Offshore Wind Farm
    Robin Rigg Offshore Wind Farm is a large offshore wind power facility located in the Irish Sea, generating renewable electricity from wind turbines installed in coastal waters.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Greater Gabbard Offshore Wind Farm
Triple: [Thanet Offshore Wind Farm, succeededByAsLargestOffshoreWindFarm, Greater Gabbard Offshore Wind Farm]
Generated description
The Greater Gabbard Offshore Wind Farm is a large-scale offshore wind power project in the North Sea off the Suffolk coast of England that became the world’s largest offshore wind farm upon its completion.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Greater Gabbard Offshore Wind Farm
Target entity description: The Greater Gabbard Offshore Wind Farm is a large-scale offshore wind power project in the North Sea off the Suffolk coast of England that became the world’s largest offshore wind farm upon its completion.
  • A. Barrow Offshore Wind Farm
    Barrow Offshore Wind Farm is a UK offshore wind power facility located in the Irish Sea that generates renewable electricity from wind turbines installed in coastal waters.
  • B. Gunfleet Sands Offshore Wind Farm
    Gunfleet Sands Offshore Wind Farm is a large offshore wind power facility in the Thames Estuary off the coast of Essex, England, contributing renewable electricity to the UK grid.
  • C. North Hoyle Offshore Wind Farm
    North Hoyle Offshore Wind Farm is one of the United Kingdom’s early commercial offshore wind power projects, located off the coast of North Wales and contributing renewable electricity to the national grid.
  • D. Thanet Offshore Wind Farm
    Thanet Offshore Wind Farm is a large offshore wind power facility located off the coast of Kent, England, known for being one of the earliest and once the largest operational offshore wind farms in the world.
  • E. Robin Rigg Offshore Wind Farm
    Robin Rigg Offshore Wind Farm is a large offshore wind power facility located in the Irish Sea, generating renewable electricity from wind turbines installed in coastal waters.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: succeededByAsLargestOffshoreWindFarm
Context triple: [Thanet Offshore Wind Farm, succeededByAsLargestOffshoreWindFarm, Greater Gabbard Offshore Wind Farm]
  • A. hasOffshoreWindFarm
    Indicates that an entity owns, operates, or is otherwise associated with a wind farm located in offshore (marine) areas.
  • B. hasWindFarm
    Indicates that one entity possesses, hosts, or contains a wind farm as part of its assets, infrastructure, or territory.
  • C. DoggerBankWindFarmStatus
    Indicates the current operational or development status of the Dogger Bank offshore wind farm project.
  • D. DoggerBankWindFarmCountry
    Indicates the country that the Dogger Bank Wind Farm is associated with or located in.
  • E. expectedToBeLargestHydroelectricSourceIn
    Indicates that something is anticipated to become the primary or largest source of hydroelectric power within a specified region or location.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c9a8ac81908b011c38698456e4 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb77cae2948190ae4507b75b5d5784 completed March 31, 2026, 7:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd67ec97348190a1ae7fc8d30af838 completed April 1, 2026, 6:46 p.m.
NEDg Description generation batch_69cd6c21172481908dc04b85ee4370a8 completed April 1, 2026, 7:04 p.m.
NED2 Entity disambiguation (via description) batch_69cd7dd65fac8190b8f44b1cf2be7bdd completed April 1, 2026, 8:19 p.m.
PD Predicate disambiguation batch_69cb36af41e081909dee92b9bc4947f1 completed March 31, 2026, 2:51 a.m.
PDg Predicate description generation batch_69cb4d9b03108190a6785834f21ff75e completed March 31, 2026, 4:29 a.m.
Created at: March 30, 2026, 5:45 p.m.