Triple

T8222427
Position Surface form Disambiguated ID Type / Status
Subject Thanet Offshore Wind Farm E192095 entity
Predicate connectedTo P37 FINISHED
Object National Grid (Great Britain) E223457 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Grid (Great Britain) | Statement: [Thanet Offshore Wind Farm, connectedTo, National Grid (Great Britain)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Grid (Great Britain)
Context triple: [Thanet Offshore Wind Farm, connectedTo, National Grid (Great Britain)]
  • A. National Grid chosen
    National Grid is a major British multinational electricity and gas utility company responsible for operating and maintaining the high-voltage power transmission network in Great Britain.
  • B. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • C. EDF Energy
    EDF Energy is a major UK-based energy company that generates and supplies electricity and gas, particularly known for operating nuclear power stations and low-carbon energy assets.
  • D. Central Electricity Board
    The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
  • E. British Electricity Authority
    The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c9a8ac81908b011c38698456e4 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb77cae2948190ae4507b75b5d5784 completed March 31, 2026, 7:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd34ca59ec8190b611681ec9dfd97f completed April 1, 2026, 3:07 p.m.
Created at: March 30, 2026, 5:45 p.m.