Triple

T8205654
Position Surface form Disambiguated ID Type / Status
Subject IMSAS E191680 entity
Predicate instanceOf P0 FINISHED
Object mandatory audit scheme C16638 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mandatory audit scheme
Context triple: [IMSAS, instanceOf, mandatory audit scheme]
  • A. auditing system
    An auditing system is a software component that systematically collects, records, and analyzes events or transactions within a system to ensure accountability, traceability, and compliance with policies or regulations.
  • B. audit function
    An audit function is a systematic process or mechanism used to independently examine, verify, and evaluate records, operations, or controls to ensure accuracy, compliance, and effectiveness.
  • C. mandatory access control system
    A mandatory access control system is a security model in which access to resources is regulated by a central authority based on predefined policies and security labels, rather than by individual user discretion.
  • D. conformity assessment scheme chosen
    A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
  • E. auditing institution
    An auditing institution is an independent organization responsible for systematically examining and evaluating financial records, operations, and controls to ensure accuracy, compliance, and accountability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c7f3e08190857bf1fc63b2a10c completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:43 p.m.