Triple

T8198089
Position Surface form Disambiguated ID Type / Status
Subject Opel Vizor E191484 entity
Predicate instanceOf P0 FINISHED
Object front-end design theme C3601 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: front-end design theme
Context triple: [Opel Vizor, instanceOf, front-end design theme]
  • A. user interface design language chosen
    A user interface design language is a standardized set of visual, interaction, and behavioral guidelines that define how digital interfaces should look and function to ensure consistency and usability across products.
  • B. UI framework
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • C. user experience design tool
    A user experience design tool is a software application that enables designers to plan, prototype, test, and refine digital product interfaces and interactions to optimize usability and user satisfaction.
  • D. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • E. design fair
    A design fair is an organized event where designers, brands, and manufacturers showcase and promote their latest products, concepts, and innovations to industry professionals and the public.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c6e9548190a4c5ca14516e4417 completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:42 p.m.