Triple

T8181551
Position Surface form Disambiguated ID Type / Status
Subject San Martín Line E191072 entity
Predicate infrastructureProject P39986 FINISHED
Object viaduct construction through Palermo–La Paternal section LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: viaduct construction through Palermo–La Paternal section | Statement: [San Martín Line, infrastructureProject, viaduct construction through Palermo–La Paternal section]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureProject
Context triple: [San Martín Line, infrastructureProject, viaduct construction through Palermo–La Paternal section]
  • A. proposedInfrastructure
    Indicates that an infrastructure project or facility has been suggested or planned but not yet approved, built, or implemented between the related entities.
  • B. majorConstructionUnder
    Indicates that a location or structure is currently undergoing significant construction work or large-scale building activity.
  • C. isPartOfInfrastructure
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • D. permanentInfrastructure
    Indicates that the relationship involves infrastructure that is intended to be long-lasting, fixed in place, and not temporary or easily removable.
  • E. notableRailwayProject chosen
    Indicates that the subject is recognized for involvement in a significant or prominent railway-related project.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c4538081909404325aa5639483 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb4c4c2e388190b86854f8b1765e61 completed March 31, 2026, 4:23 a.m.
PD Predicate disambiguation batch_69cb36a7952481908f34e3e82f375a84 completed March 31, 2026, 2:51 a.m.
Created at: March 30, 2026, 5:40 p.m.