Triple
T8137659
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Authority for Electricity |
E190011
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electricity authority |
C7386
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electricity authority Context triple: [Central Authority for Electricity, instanceOf, electricity authority]
-
A.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
-
C.
electricity industry association
An electricity industry association is an organized group that represents and advocates for the collective interests of companies and stakeholders involved in the generation, transmission, distribution, and sale of electric power.
-
D.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
E.
energy agency
chosen
An energy agency is an organization responsible for planning, regulating, and promoting the efficient, reliable, and sustainable production, distribution, and use of energy resources within a specific region or sector.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82bd9900819099477cdc2eb4244f |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:35 p.m.