Triple

T8112029
Position Surface form Disambiguated ID Type / Status
Subject Daniil Granin E189377 entity
Predicate employer P7 FINISHED
Object Kirov Plant E419770 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kirov Plant | Statement: [Daniil Granin, employer, Kirov Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kirov Plant
Context triple: [Daniil Granin, employer, Kirov Plant]
  • A. Kovrov Mechanical Plant
    Kovrov Mechanical Plant is a Russian arms manufacturer historically known for producing notable Soviet small arms, including the SVT-40 semi-automatic rifle.
  • B. Kirov Factory chosen
    Kirov Factory is a historic Russian heavy machinery and defense plant best known for producing Soviet tanks and other armored vehicles.
  • C. Uralvagonzavod plant
    The Uralvagonzavod plant is a major Russian industrial complex and one of the world’s largest manufacturers of tanks and railway rolling stock.
  • D. Mytishchi Machine-Building Plant
    Mytishchi Machine-Building Plant is a major Russian industrial enterprise known for producing railway rolling stock and military vehicles.
  • E. Ulyanovsk Mechanical Plant
    Ulyanovsk Mechanical Plant is a Russian defense enterprise known for producing advanced air defense systems and other military equipment.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82baad008190ab2859712b9b1607 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb432bcb648190b5ddbcc2a3dbc9b1 completed March 31, 2026, 3:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc942a9af881908b7ddc724755893e completed April 1, 2026, 3:42 a.m.
Created at: March 30, 2026, 5:32 p.m.