Triple

T8097030
Position Surface form Disambiguated ID Type / Status
Subject Tehran Metro Line 8 E189010 entity
Predicate partOf P40 FINISHED
Object Tehran Metro E35854 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tehran Metro | Statement: [Tehran Metro Line 8, partOf, Tehran Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tehran Metro
Context triple: [Tehran Metro Line 8, partOf, Tehran Metro]
  • A. Tehran Metro chosen
    Tehran Metro is the rapid transit system serving Iran’s capital, providing extensive urban and suburban rail transport across the Tehran metropolitan area.
  • B. Tehran Metro Line 1
    Tehran Metro Line 1 is the main north–south rapid transit line in Tehran’s metro system, running through many of the city’s central and densely populated areas.
  • C. Mashhad Metro
    Mashhad Metro is the urban rapid transit system serving the city of Mashhad in northeastern Iran, providing high-capacity public transportation across the metropolitan area.
  • D. Tehran Metro Line 2
    Tehran Metro Line 2 is a major east–west rapid transit line in Tehran’s metro system, serving numerous central and western districts and providing key transfer connections with several other lines.
  • E. Tehran Metro Line 3
    Tehran Metro Line 3 is a major north–south rapid transit line in Tehran’s metro network, serving as one of the city’s key high-capacity urban rail corridors.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b886d88190a9cba0d5a4a27521 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb429319048190b612c8060a9a24d2 completed March 31, 2026, 3:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69cf421875f88190a005c3ffba04dffe completed April 3, 2026, 4:29 a.m.
Created at: March 30, 2026, 5:30 p.m.