Triple

T8096783
Position Surface form Disambiguated ID Type / Status
Subject Karaj Dam E189004 entity
Predicate partOf P40 FINISHED
Object Iran national power grid
The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
E711869 NE FINISHED

Disambiguation candidates (2 decisions)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Iran national power grid
Context triple: [Karaj Dam, partOf, Iran national power grid]
  • A. Pakistan national power grid
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • C. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • D. IranShahr Terminal
    IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
  • E. Matiari–Lahore HVDC transmission line
    The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Iran national power grid
Target entity description: The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
  • A. Pakistan national power grid
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • C. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • D. IranShahr Terminal
    IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
  • E. Matiari–Lahore HVDC transmission line
    The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
  • F. None of above. chosen

Provenance (5 batches)

Stage Batch ID Job type Status
creating batch_69ca82b886d88190a9cba0d5a4a27521 elicitation completed
NER batch_69cb429319048190b612c8060a9a24d2 ner completed
NED1 batch_69cc641a4b4881908a1aec4bc2ed619e ned_source_triple completed
NED2 batch_69cc69b93bbc8190be2338182dd57b17 ned_description completed
NEDg batch_69cc68647cec81909736383fbe73d2e8 nedg completed
Created at: March 30, 2026, 5:30 p.m.