Triple
T8096783
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Karaj Dam |
E189004
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Iran national power grid
The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
|
E711869
|
NE FINISHED |
Disambiguation candidates (2 decisions)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Iran national power grid Context triple: [Karaj Dam, partOf, Iran national power grid]
-
A.
Pakistan national power grid
The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
-
B.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
C.
Uri I Power Station
Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
-
D.
IranShahr Terminal
IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
-
E.
Matiari–Lahore HVDC transmission line
The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Iran national power grid Target entity description: The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
-
A.
Pakistan national power grid
The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
-
B.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
C.
Uri I Power Station
Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
-
D.
IranShahr Terminal
IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
-
E.
Matiari–Lahore HVDC transmission line
The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
- F. None of above. chosen
Provenance (5 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69ca82b886d88190a9cba0d5a4a27521 |
elicitation | completed |
| NER | batch_69cb429319048190b612c8060a9a24d2 |
ner | completed |
| NED1 | batch_69cc641a4b4881908a1aec4bc2ed619e |
ned_source_triple | completed |
| NED2 | batch_69cc69b93bbc8190be2338182dd57b17 |
ned_description | completed |
| NEDg | batch_69cc68647cec81909736383fbe73d2e8 |
nedg | completed |
Created at: March 30, 2026, 5:30 p.m.