Triple

T8095436
Position Surface form Disambiguated ID Type / Status
Subject Ubley E188971 entity
Predicate near P350 FINISHED
Object Blagdon Lake E713527 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Blagdon Lake | Statement: [Ubley, near, Blagdon Lake]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Blagdon Lake
Context triple: [Ubley, near, Blagdon Lake]
  • A. Blagdon Lake chosen
    Blagdon Lake is a large artificial reservoir in North Somerset, England, known for supplying drinking water to Bristol and for its popular trout fishing and wildlife habitats.
  • B. Blake Mere
    Blake Mere is one of the natural meres (shallow lakes) in the Ellesmere area of Shropshire, England.
  • C. White Mere
    White Mere is a small natural lake near the town of Ellesmere in Shropshire, England, known as one of the area's characteristic meres formed by glacial activity.
  • D. Chartley Pond
    Chartley Pond is a small natural pond located in the town of Norton in southeastern Massachusetts, known for its local recreational and ecological value.
  • E. Horsey Mere
    Horsey Mere is a shallow freshwater lake and nature reserve in the Norfolk Broads, renowned for its wildlife, reedbeds, and traditional boating.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b7b3e88190b9041ab0ef28b3cb completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb4291f1d4819098985ac2b20b6c75 completed March 31, 2026, 3:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69cdc65afac4819094282e7d63619111 completed April 2, 2026, 1:28 a.m.
Created at: March 30, 2026, 5:30 p.m.