Triple

T8094507
Position Surface form Disambiguated ID Type / Status
Subject One Wilshire E188948 entity
Predicate instanceOf P0 FINISHED
Object internet exchange point C2108 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: internet exchange point
Context triple: [One Wilshire, instanceOf, internet exchange point]
  • A. internet infrastructure component chosen
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • B. access point
    An access point is a networking device that allows wireless devices to connect to a wired network, typically providing Wi-Fi connectivity within a specific area.
  • C. network connector
    A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
  • D. local exchange carriers
    Local exchange carriers are telecommunications companies that provide local telephone and related communication services within a defined geographic area, connecting customers to the public switched telephone network.
  • E. port network
    A port network is an abstract representation of an electrical or communication system modeled as interconnected ports through which signals, power, or data are exchanged and analyzed.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b7b3e88190b9041ab0ef28b3cb completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:30 p.m.