Triple
T8083285
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Graham (Scottish hill classification) |
E188669
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountain listing |
C6595
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountain listing Context triple: [Graham (Scottish hill classification), instanceOf, mountain listing]
-
A.
mountain list
chosen
A mountain list is a collection of mountains, typically organized with details such as names, elevations, locations, and other relevant attributes for reference or comparison.
-
B.
mountain
A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
-
C.
mountain classification
Mountain classification is the conceptual process of categorizing mountains based on attributes such as elevation, prominence, geology, morphology, and regional context.
-
D.
seven summits peak
A seven summits peak is any one of the highest mountains on each of the seven continents, collectively forming the mountaineering challenge known as the Seven Summits.
-
E.
mountain chain
A mountain chain is a linear series of connected mountains formed by tectonic processes, often extending over great distances and shaping regional climate and geography.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82b662e88190b9323daab8c28a21 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:29 p.m.