Triple

T8083008
Position Surface form Disambiguated ID Type / Status
Subject Mengtian E188662 entity
Predicate launchVehicle P4020 FINISHED
Object Long March 5B E181433 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Long March 5B | Statement: [Mengtian, launchVehicle, Long March 5B]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Long March 5B
Context triple: [Mengtian, launchVehicle, Long March 5B]
  • A. Long March 5B chosen
    Long March 5B is a heavy-lift Chinese orbital launch vehicle primarily used to carry large modules and payloads for the country’s space station program.
  • B. Long March 5
    Long March 5 is a heavy-lift Chinese orbital launch vehicle developed by the China National Space Administration for deploying large payloads to Earth orbit and deep-space missions.
  • C. Long March 7
    Long March 7 is a Chinese medium-lift launch vehicle designed primarily to deliver cargo spacecraft and components for China’s crewed space program into orbit.
  • D. Long March 3C
    Long March 3C is a Chinese three-stage orbital launch vehicle, part of the Long March rocket family, primarily used to place satellites into geostationary transfer orbit.
  • E. Long March 3B
    Long March 3B is a Chinese heavy-lift orbital launch vehicle primarily used to place communications and navigation satellites into geostationary transfer orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b662e88190b9323daab8c28a21 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb415cb4688190920868317e77bbff completed March 31, 2026, 3:37 a.m.
NED1 Entity disambiguation (via context triple) batch_69ce88498cf081909c25c292c014fe8c completed April 2, 2026, 3:16 p.m.
Created at: March 30, 2026, 5:28 p.m.