Triple
T8080854
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Foz do Chapecó Dam |
E188610
|
entity |
| Predicate | contributesTo |
P477
|
FINISHED |
| Object | Brazilian National Interconnected System |
E710184
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brazilian National Interconnected System | Statement: [Foz do Chapecó Dam, contributesTo, Brazilian National Interconnected System]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Brazilian National Interconnected System Context triple: [Foz do Chapecó Dam, contributesTo, Brazilian National Interconnected System]
-
A.
Brazilian National Interconnected System
chosen
The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
-
B.
Colombian National Interconnected System
The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
-
C.
Furnas Centrais Elétricas
Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
-
D.
SIC (Sistema Interconectado Central)
SIC (Sistema Interconectado Central) is Chile’s former main interconnected electric power grid that supplied electricity to the central region of the country, including most of its population and economic activity.
-
E.
Paraná River hydroelectric system
The Paraná River hydroelectric system is a network of large dams and power stations along the Paraná River that collectively form one of South America’s most important sources of renewable electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82b662e88190b9323daab8c28a21 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb40a504d48190ace96e814d99b182 |
completed | March 31, 2026, 3:33 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cc93eddef48190b5f499a5b52428c8 |
completed | April 1, 2026, 3:41 a.m. |
Created at: March 30, 2026, 5:28 p.m.