Triple

T8078412
Position Surface form Disambiguated ID Type / Status
Subject Shanghai Stadium Management Company E188552 entity
Predicate maintenanceScope P26299 FINISHED
Object infrastructure of Shanghai Stadium LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: infrastructure of Shanghai Stadium | Statement: [Shanghai Stadium Management Company, maintenanceScope, infrastructure of Shanghai Stadium]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: maintenanceScope
Context triple: [Shanghai Stadium Management Company, maintenanceScope, infrastructure of Shanghai Stadium]
  • A. maintenance
    Indicates that an entity performs, requires, or is involved in upkeep, repair, or preservation activities for another entity or system.
  • B. maintenanceFeature
    Indicates that one entity serves as a maintenance-related feature, capability, or component associated with another entity.
  • C. maintenanceConcept
    Indicates a conceptual or abstract relationship related to maintenance activities, strategies, or principles rather than a specific maintenance event.
  • D. maintenanceAuthority chosen
    Indicates that one entity has the responsibility or official power to maintain, service, or keep another entity in proper working condition.
  • E. maintenancePractice
    Indicates the specific actions or methods used to preserve, repair, or optimize the condition or performance of something over time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b50c708190863f661d438e68df completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb40a2b64c8190ae2b3414b4f840e4 completed March 31, 2026, 3:33 a.m.
PD Predicate disambiguation batch_69cb049f1614819087360d1a4c6f0faa completed March 30, 2026, 11:17 p.m.
Created at: March 30, 2026, 5:28 p.m.