Triple

T8071301
Position Surface form Disambiguated ID Type / Status
Subject Wood Group Environment & Infrastructure business E188378 entity
Predicate instanceOf P0 FINISHED
Object infrastructure engineering division C4335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure engineering division
Context triple: [Wood Group Environment & Infrastructure business, instanceOf, infrastructure engineering division]
  • A. engineering division chosen
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • B. civil and environmental engineering department
    A civil and environmental engineering department is an academic unit that educates students and conducts research on the planning, design, construction, and management of infrastructure and environmental systems to support sustainable and resilient communities.
  • C. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • D. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. civil engineering designation
    A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b50c708190863f661d438e68df completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:27 p.m.