Triple

T8071203
Position Surface form Disambiguated ID Type / Status
Subject Golder Associates E188376 entity
Predicate instanceOf P0 FINISHED
Object geotechnical engineering company C426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geotechnical engineering company
Context triple: [Golder Associates, instanceOf, geotechnical engineering company]
  • A. engineering firm chosen
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • B. geotechnical engineering laboratory
    A geotechnical engineering laboratory is a specialized facility where soil, rock, and related materials are tested and analyzed to determine their engineering properties for safe and effective design of foundations, earth structures, and other geotechnical systems.
  • C. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • D. architecture and design firm
    A professional company that plans, designs, and often oversees the construction of buildings and interior spaces, integrating aesthetics, functionality, and client needs.
  • E. earthwork
    An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b50c708190863f661d438e68df completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:27 p.m.