Triple
T8067948
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Colorado River Compact |
E188292
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | foundational document of Colorado River law |
C272
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: foundational document of Colorado River law Context triple: [Colorado River Compact, instanceOf, foundational document of Colorado River law]
-
A.
water resources development act
The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
-
B.
foundational legal document
chosen
A foundational legal document is an authoritative written instrument that establishes the core principles, structures, and rules governing a legal system, organization, or relationship.
-
C.
interstate boundary river
An interstate boundary river is a natural watercourse whose channel or thalweg forms all or part of the legal border between two or more states or equivalent political jurisdictions.
-
D.
Wild and Scenic River
A Wild and Scenic River is a free-flowing waterway and its adjacent environment that are legally protected to preserve their natural, cultural, and recreational values in an undeveloped condition.
-
E.
National Scenic River
A National Scenic River is a protected waterway designated for its outstanding natural, cultural, and recreational values, preserved in a largely free-flowing and undeveloped condition for public enjoyment and conservation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82b42674819086840efea12478e5 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:27 p.m.