Triple

T8051565
Position Surface form Disambiguated ID Type / Status
Subject Tilbury Docks E187684 entity
Predicate hasCruiseTerminalName P80749 FINISHED
Object London International Cruise Terminal
London International Cruise Terminal is a major passenger cruise facility serving ships visiting the London area via Tilbury on the River Thames.
E706613 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: London International Cruise Terminal | Statement: [Tilbury Docks, hasCruiseTerminalName, London International Cruise Terminal]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: London International Cruise Terminal
Context triple: [Tilbury Docks, hasCruiseTerminalName, London International Cruise Terminal]
  • A. Liverpool Cruise Terminal
    Liverpool Cruise Terminal is a passenger ship facility on the River Mersey in Liverpool, England, serving as a key embarkation and arrival point for cruise liners visiting the city.
  • B. Black Falcon Cruise Terminal
    Black Falcon Cruise Terminal is Boston’s primary cruise ship terminal, serving as a major embarkation and disembarkation point for passenger cruises in the Port of Boston.
  • C. Mayflower Cruise Terminal
    Mayflower Cruise Terminal is a major passenger cruise facility in Southampton, England, serving as a key departure and arrival point for international cruise ships.
  • D. London Gateway Port
    London Gateway Port is a major deep-sea container terminal and logistics hub on the River Thames in Essex, developed by DP World as one of the UK’s most advanced and largest ports.
  • E. City Cruise Terminal
    City Cruise Terminal is a major passenger cruise facility within Southampton’s port complex, serving as a key embarkation and disembarkation point for large cruise ships.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: London International Cruise Terminal
Triple: [Tilbury Docks, hasCruiseTerminalName, London International Cruise Terminal]
Generated description
London International Cruise Terminal is a major passenger cruise facility serving ships visiting the London area via Tilbury on the River Thames.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: London International Cruise Terminal
Target entity description: London International Cruise Terminal is a major passenger cruise facility serving ships visiting the London area via Tilbury on the River Thames.
  • A. Liverpool Cruise Terminal
    Liverpool Cruise Terminal is a passenger ship facility on the River Mersey in Liverpool, England, serving as a key embarkation and arrival point for cruise liners visiting the city.
  • B. Black Falcon Cruise Terminal
    Black Falcon Cruise Terminal is Boston’s primary cruise ship terminal, serving as a major embarkation and disembarkation point for passenger cruises in the Port of Boston.
  • C. Mayflower Cruise Terminal
    Mayflower Cruise Terminal is a major passenger cruise facility in Southampton, England, serving as a key departure and arrival point for international cruise ships.
  • D. London Gateway Port
    London Gateway Port is a major deep-sea container terminal and logistics hub on the River Thames in Essex, developed by DP World as one of the UK’s most advanced and largest ports.
  • E. City Cruise Terminal
    City Cruise Terminal is a major passenger cruise facility within Southampton’s port complex, serving as a key embarkation and disembarkation point for large cruise ships.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasCruiseTerminalName
Context triple: [Tilbury Docks, hasCruiseTerminalName, London International Cruise Terminal]
  • A. isCruisePort
    Indicates that a location functions as a port where cruise ships dock, embark, or disembark passengers.
  • B. hasPassengerTerminal
    Indicates that one entity possesses or is equipped with a passenger terminal used for boarding, alighting, or handling passengers.
  • C. hasCargoTerminal
    Indicates that a location or facility includes or is equipped with a cargo terminal for handling freight.
  • D. hasPassengerTerminalFunction
    Indicates that something serves the role or performs the function of a passenger terminal, supporting the handling and movement of passengers.
  • E. servesCruisePort
    Indicates that one entity (typically a transportation service or route) provides service to or operates at a particular cruise port.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b15e948190a62fd7af5218426a completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3f7aab6481909d4a7cb9eabcd2af completed March 31, 2026, 3:28 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc571b737881909ae8eadcc7894223 completed March 31, 2026, 11:22 p.m.
NEDg Description generation batch_69cc58ae255c8190a6a2d2f335c6cc3f completed March 31, 2026, 11:28 p.m.
NED2 Entity disambiguation (via description) batch_69cc5ccee5648190a8ebdf8029eded98 completed March 31, 2026, 11:46 p.m.
PD Predicate disambiguation batch_69cb049a1b9c8190811c396421ebf9c9 completed March 30, 2026, 11:17 p.m.
PDg Predicate description generation batch_69cb14bcbbc0819094a98e7ffffb7a40 completed March 31, 2026, 12:26 a.m.
Created at: March 30, 2026, 5:24 p.m.