Triple

T8044198
Position Surface form Disambiguated ID Type / Status
Subject Vistula Lagoon E187507 entity
Predicate inflow P415 FINISHED
Object Nogat River E194185 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nogat River | Statement: [Vistula Lagoon, inflow, Nogat River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nogat River
Context triple: [Vistula Lagoon, inflow, Nogat River]
  • A. Nogat chosen
    Nogat is a river in northern Poland that branches off from the Vistula and flows into the Baltic Sea near the Bay of Gdańsk.
  • B. Banias River
    The Banias River is a major spring-fed stream in the Golan Heights that forms one of the principal headwaters of the Jordan River.
  • C. Geba River
    The Geba River is a major West African waterway that flows through Guinea-Bissau to the Atlantic Ocean, forming an important estuary and transport route for the region.
  • D. Kishon River
    The Kishon River is a major watercourse in northern Israel that flows from the Jezreel Valley to the Mediterranean Sea near Haifa.
  • E. Ega River
    The Ega River is a significant watercourse in northern Spain that flows through Navarre and La Rioja before joining the Ebro River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b00cb48190b59a300f70e97bd7 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3f4b5e0c819092949af0f995b850 completed March 31, 2026, 3:28 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc570cfad08190a8ed35ef2a47f497 completed March 31, 2026, 11:21 p.m.
Created at: March 30, 2026, 5:23 p.m.