Triple

T8037794
Position Surface form Disambiguated ID Type / Status
Subject Tapi River E187153 entity
Predicate hasDam P8736 FINISHED
Object Ukai Dam
Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
E708625 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ukai Dam | Statement: [Tapi River, hasDam, Ukai Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ukai Dam
Context triple: [Tapi River, hasDam, Ukai Dam]
  • A. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • B. Nagayasuguchi Dam
    Nagayasuguchi Dam is a hydroelectric dam located on Japan’s Yoshino River, used primarily for power generation and flood control.
  • C. Shimen Dam
    Shimen Dam is a major concrete gravity dam in northern Taiwan that provides water supply, flood control, and hydroelectric power as part of the Shimen Reservoir system.
  • D. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • E. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ukai Dam
Triple: [Tapi River, hasDam, Ukai Dam]
Generated description
Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ukai Dam
Target entity description: Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • A. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • B. Nagayasuguchi Dam
    Nagayasuguchi Dam is a hydroelectric dam located on Japan’s Yoshino River, used primarily for power generation and flood control.
  • C. Shimen Dam
    Shimen Dam is a major concrete gravity dam in northern Taiwan that provides water supply, flood control, and hydroelectric power as part of the Shimen Reservoir system.
  • D. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • E. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ae2d1081909dbfee42b41db419 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3f19a6b4819085e2887fb0c54d08 completed March 31, 2026, 3:27 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc56fa97ac8190a0bd646d9ec345e4 completed March 31, 2026, 11:21 p.m.
NEDg Description generation batch_69cc58abd96c8190ab9eeaece67d5408 completed March 31, 2026, 11:28 p.m.
NED2 Entity disambiguation (via description) batch_69cc5cc2f71081909cb7c0c245368edb completed March 31, 2026, 11:46 p.m.
Created at: March 30, 2026, 5:23 p.m.