Triple

T8028870
Position Surface form Disambiguated ID Type / Status
Subject Disappointment Peak Cleaver route E186925 entity
Predicate instanceOf P0 FINISHED
Object ridge climb route C23418 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ridge climb route
Context triple: [Disappointment Peak Cleaver route, instanceOf, ridge climb route]
  • A. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • B. ice climbing route
    An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
  • C. multi-pitch climbing route
    A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
  • D. traditional climbing route
    A traditional climbing route is a rock climb where climbers place and remove their own protective gear in natural features of the rock as they ascend, rather than relying on pre-fixed bolts.
  • E. alpine climbing route section
    An alpine climbing route section is a distinct segment of a high-mountain ascent characterized by specific terrain, difficulty, and required techniques within the overall route.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ad4e2c8190a693e3c9e30fe66f completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:21 p.m.