Triple

T8024218
Position Surface form Disambiguated ID Type / Status
Subject Almatti Reservoir E186812 entity
Predicate formedBy P972 FINISHED
Object Almatti Dam E33538 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Almatti Dam | Statement: [Almatti Reservoir, formedBy, Almatti Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Almatti Dam
Context triple: [Almatti Reservoir, formedBy, Almatti Dam]
  • A. Almatti Dam chosen
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • B. Zhinvali Dam
    Zhinvali Dam is a large hydroelectric dam and reservoir in eastern Georgia, known for its striking turquoise waters and role in supplying water and power to the region.
  • C. Shashe Dam
    Shashe Dam is a water reservoir structure built on the Shashe River, primarily used for water supply, irrigation, and regional resource management.
  • D. Baipaza Dam
    Baipaza Dam is a major hydroelectric dam in Tajikistan that harnesses the Vakhsh River to generate power and support regional water management.
  • E. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ad4e2c8190a693e3c9e30fe66f completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3e90c7348190abc1013a312e4f1a completed March 31, 2026, 3:25 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd6759e83c8190869732f955279cee completed April 1, 2026, 6:43 p.m.
Created at: March 30, 2026, 5:21 p.m.