Triple

T8017844
Position Surface form Disambiguated ID Type / Status
Subject Märklin E186664 entity
Predicate brand P1500 FINISHED
Object Märklin H0 E186664 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Märklin H0 | Statement: [Märklin, brand, Märklin H0]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Märklin H0
Context triple: [Märklin, brand, Märklin H0]
  • A. Märklin chosen
    Märklin is a renowned German manufacturer of model railways and technical toys, known for its high-quality trains and detailed miniature systems.
  • B. Siemens-Duewag U2
    The Siemens-Duewag U2 is a high-floor light rail vehicle widely used in North American transit systems, notably in early expansions of Calgary’s CTrain network.
  • C. N scale
    N scale is a popular model railway scale characterized by its small size (typically 1:160), allowing extensive layouts in relatively limited space.
  • D. Sieg Railway
    The Sieg Railway is a German rail line that runs through the Sieg Valley, connecting towns and cities along the River Sieg in North Rhine-Westphalia and Rhineland-Palatinate.
  • E. Comeng EMU
    The Comeng EMU is a long-serving class of electric multiple unit trains used on Melbourne's suburban rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ac7fc081909b1398cf025423af completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3df4f1b8819089a8b67f136bce9a completed March 31, 2026, 3:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc56c213ec8190b3bd96c42d1357e4 completed March 31, 2026, 11:20 p.m.
Created at: March 30, 2026, 5:20 p.m.