Triple

T8017099
Position Surface form Disambiguated ID Type / Status
Subject The Maltings, Ely E186644 entity
Predicate instanceOf P0 FINISHED
Object riverside complex C23393 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: riverside complex
Context triple: [The Maltings, Ely, instanceOf, riverside complex]
  • A. riverside thoroughfare
    A riverside thoroughfare is a road, path, or promenade that runs alongside a river, facilitating transportation, access, and recreational use of the waterfront.
  • B. lighthouse complex
    A lighthouse complex is a coastal facility comprising the lighthouse tower and its associated buildings, equipment, and infrastructure that together support the operation, maintenance, and habitation required for safe maritime navigation.
  • C. village complex
    A village complex is a clustered arrangement of residential, communal, and support structures that together form the functional and social core of a small rural settlement.
  • D. river valley park system
    A river valley park system is an interconnected network of parks, trails, and natural areas along a river corridor designed to protect ecosystems, manage floodplains, and provide recreational and scenic opportunities for the public.
  • E. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ac7fc081909b1398cf025423af completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:20 p.m.