Triple

T8016515
Position Surface form Disambiguated ID Type / Status
Subject Temple of All Religions E186630 entity
Predicate underConstruction P44772 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Temple of All Religions, underConstruction, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: underConstruction
Context triple: [Temple of All Religions, underConstruction, true]
  • A. laterConstruction
    Indicates that one construction event or structure occurred or was built after another in time.
  • B. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • C. constructionDirection
    Indicates the orientation or path along which a structure is built or assembled.
  • D. constructionPhase chosen
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • E. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ac7fc081909b1398cf025423af completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3df37a00819088780e5461bc5b41 completed March 31, 2026, 3:22 a.m.
PD Predicate disambiguation batch_69cb048c9f488190b4fb8917a9c21bc5 completed March 30, 2026, 11:17 p.m.
Created at: March 30, 2026, 5:20 p.m.