Triple
T8015700
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bridge House Estates |
E186609
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge maintenance charity |
C6054
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge maintenance charity Context triple: [Bridge House Estates, instanceOf, bridge maintenance charity]
-
A.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
B.
bridgehead
A bridgehead is a secured position on the enemy’s side of a river or obstacle, established by advancing forces to enable further troop and supply movement.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
E.
waterways charity
chosen
A waterways charity is an organization dedicated to protecting, restoring, and enhancing rivers, canals, and other inland waterways for environmental, recreational, and community benefit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82ac7fc081909b1398cf025423af |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:20 p.m.