Triple
T8014937
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SolarWorld |
E186588
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | solar energy company |
C14998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: solar energy company Context triple: [SolarWorld, instanceOf, solar energy company]
-
A.
energy solutions company
An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
-
B.
renewable energy developer
chosen
A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
-
C.
wholesale energy company
A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
-
D.
integrated energy company
An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
-
E.
photovoltaic concept
A photovoltaic concept is a theoretical or practical design framework that describes how materials and device structures convert light energy into electrical energy through the photovoltaic effect.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82ac7fc081909b1398cf025423af |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:19 p.m.