Triple
T7996643
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gadeokdo New Airport area (national project vicinity) |
E186143
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned economic hub |
C5755
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned economic hub Context triple: [Gadeokdo New Airport area (national project vicinity), instanceOf, planned economic hub]
-
A.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
economic and technological development zone
chosen
An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
-
C.
centralized economic planning system
A centralized economic planning system is a structure in which a central authority makes decisions about the allocation of resources, production targets, and distribution of goods and services across an economy.
-
D.
planned regional development bank
A planned regional development bank is a proposed financial institution designed to mobilize and allocate long-term capital within a specific geographic region to support sustainable economic growth, infrastructure, and social development projects.
-
E.
industrial center
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829c6c308190ab05b43d234c52b2 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:17 p.m.