Triple

T7996643
Position Surface form Disambiguated ID Type / Status
Subject Gadeokdo New Airport area (national project vicinity) E186143 entity
Predicate instanceOf P0 FINISHED
Object planned economic hub C5755 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned economic hub
Context triple: [Gadeokdo New Airport area (national project vicinity), instanceOf, planned economic hub]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. economic and technological development zone chosen
    An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
  • C. centralized economic planning system
    A centralized economic planning system is a structure in which a central authority makes decisions about the allocation of resources, production targets, and distribution of goods and services across an economy.
  • D. planned regional development bank
    A planned regional development bank is a proposed financial institution designed to mobilize and allocate long-term capital within a specific geographic region to support sustainable economic growth, infrastructure, and social development projects.
  • E. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca829c6c308190ab05b43d234c52b2 completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:17 p.m.